In a separate suit, Malcolm Drilling Company filed an $11 million claim against STP — a joint venture including New York-based Dragados USA and California-based Tutor Perini — due to what it said resulted from difficult soil conditions when it was building the vault.
STP disputed the claims, as it said the contractor had done previous work in the same soil.