Top

Tag: FIGG


Construction Processes, Design

Construction of Houston ship channel bridge halted to fix FIGG design

January 9, 2020

Via: Construction Dive

It is not unusual for a very large, engineering-heavy project like the Ship Channel Bridge to have an independent consultant review the engineer of record’s design. In fact, FIGG was required by the Florida DOT to retain an independent engineering […]