Construction projects, like anything else in life, are subject to change. Design blunders, unanticipated revisions to building codes, an owner-driven switch in material selection — all of these events can lead to changes that add a few dollars or create a significant addition to a project’s scope and cost.
General contractors and subcontractors have different considerations when faced with a directive to perform work outside of their original contracts.